
Strength and capacity in the development of railway infrastructure
C/ Valportillo II, 8 bis.
Pol. Ind. Alcobendas | 28108-Alcobendas,
Madrid
Activity
Energy remote control
Client
Administrador de Infraestructuras Ferroviarias (ADIF)
Location
Spain
Typology
Conventional
Execution of the drafting of the construction project and civil works for the installation of the Remote Control of Disconnectors on routes, stations and junctions, to protect the installations of the Overhead Contact Line, improve the maintenance of the installations and optimise the resolution of breakdowns or incidents on ADIF railway lines.
Back