{"id":981,"date":"2023-03-07T15:53:05","date_gmt":"2023-03-07T15:53:05","guid":{"rendered":"https:\/\/www.syneox.com\/en\/?post_type=proyectos&#038;p=981"},"modified":"2023-05-19T12:02:27","modified_gmt":"2023-05-19T12:02:27","slug":"installation-of-electrification-systems-on-the-indian-rail-network","status":"publish","type":"projects","link":"https:\/\/www.syneox.com\/en\/projects\/installation-of-electrification-systems-on-the-indian-rail-network\/","title":{"rendered":"Installation of electrification systems on the Indian rail network"},"content":{"rendered":"\n<div class=\"wp-block-columns is-layout-flex wp-container-core-columns-is-layout-9d6595d7 wp-block-columns-is-layout-flex\">\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<p>Execution of all works for the design, supply, installation, testing and commissioning of the flexible overhead catenary, electrification, signalling and traffic control systems and associated works for the installation of the electrical systems for the railway network between Amla &#8211; Chhindwara, Raipur-Khariar, Khariar-Titlagarh, Bina-Kota, Anikpur-Satna, Satna-Jabalpur and Jharsuguda-Dungripali.<\/p>\n\n\n\n<p>The total amount of work carried out by Syneox <strong>totals 1,935 kilometres of railway electrification, the construction of 13 electrical substations for electricity supply, 59 switching stations and the installation of SCADA (Supervisory Control And Data Acquisition) systems.<\/strong><\/p>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n    \n    <a href=\"..\/..\/projects\/\" class=\"d-flex justify-content-end me-auto mt-5\" style=\"width: fit-content; text-decoration: none; color: #000;\">\n        <p class=\"prev prev-big\" style=\"pointer-events: inital;\">\n            <svg id=\"prev-big\" width=\"20px\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" viewBox=\"0 0 186.55 246.77\"><path style=\"fill: var(--green);\" d=\"M157.56,231.86c13.06-14.01,12.5-35.98-1.7-49.23l-43.93-42.98c-9.09-8.9-9.09-23.48,0-32.38l42.41-41.66c14.77-12.31,16.85-34.27,4.54-49.04C146.58,1.81,124.61-.27,109.84,12.03L15.36,97.62h0c-7.01,6.63-11.36,15.72-11.36,25.75s4.35,19.31,11.36,25.56h0l92.97,84.45c14.01,13.06,35.98,12.5,49.23-1.7v.19Z\"\/><\/svg>\n        <\/p>\n        <p class=\"ms-3\" style=\"font-size: 1.7rem\">Back<\/p>\n    <\/a>\n    \n    \n<\/div>\n\n\n\n<div class=\"wp-block-column is-layout-flow wp-block-column-is-layout-flow\">\n<div class=\"wp-block-migb-masonry-gallery migb_817623fd\" data-id=\"817623fd\" id=\"817623fd\"><a class=\"single-gallery-image gray__scale\" href=\"https:\/\/www.syneox.com\/en\/\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1.jpg\" role=\"button\"><figure><img fetchpriority=\"high\" decoding=\"async\" width=\"1336\" height=\"768\" src=\"https:\/\/www.syneox.com\/en\/\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1.jpg\" alt=\"Gallery Image\" class=\"wp-image-3302\" srcset=\"https:\/\/www.syneox.com\/en\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1.jpg 1336w, https:\/\/www.syneox.com\/en\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1-300x172.jpg 300w, https:\/\/www.syneox.com\/en\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1-1024x589.jpg 1024w, https:\/\/www.syneox.com\/en\/wp-content\/uploads\/2023\/03\/instalacion-electrificacion-red-ferroviraria-india-1-768x441.jpg 768w\" sizes=\"(max-width: 1336px) 100vw, 1336px\" \/><\/figure><\/a><\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Execution of all works for the design, supply, installation, testing and commissioning of the flexible overhead catenary, electrification, signalling and traffic control systems and associated works for the installation of the electrical systems for the railway network between Amla &#8211; Chhindwara, Raipur-Khariar, Khariar-Titlagarh, Bina-Kota, Anikpur-Satna, Satna-Jabalpur and Jharsuguda-Dungripali. The total amount of work carried out [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":3301,"template":"","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[],"class_list":["post-981","projects","type-projects","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/projects\/981","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/users\/7"}],"version-history":[{"count":0,"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/projects\/981\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/media\/3301"}],"wp:attachment":[{"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/media?parent=981"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/categories?post=981"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.syneox.com\/en\/wp-json\/wp\/v2\/tags?post=981"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}